2019 New Style Alloy Steel ASTM A335 Standard Grade T92 P92 High Pressure Boiler Seamless pipe

Short Description:

Standards:
ASME SA106—High temperature seamless carbon steel tube

ASME SA179—Seamless cold drawn low carbon steel pipe for heat exchanger and condenser

ASME SA192—Seamless carbon steel boiler tube for high pressure

ASME SA210—Seamless Medium Carbon Steel Pipe for Boilers and Superheaters

ASME SA213—Seamless ferritic and austenitic alloy steel pipes for boilers, superheaters and heat exchangers

ASME SA335—Seamless ferritic alloy steel nominal tube for high temperature

DIN17175 — Seamless steel pipe made of heat-resistant steel

EN10216-2 —Unalloyed steel and alloy steel pipes with specified high temperature properties

GB5310 —Seamless steel pipe for high pressure boiler

GB3087 —Seamless steel pipe for low and medium pressure boilers


Product Detail

Product Tags

That has a sound business credit history, outstanding after-sales service and modern producing facilities, we have earned an superb popularity amid our buyers across the planet for 2019 New Style Alloy Steel ASTM A335 Standard Grade T92 P92 High Pressure Boiler Seamless pipe, All products are manufactured with advanced equipment and strict QC procedures in order to guarantee top quality. Welcome prospects new and outdated to get hold of us for business enterprise cooperation.
That has a sound business credit history, outstanding after-sales service and modern producing facilities, we have earned an superb popularity amid our buyers across the planet for , Furthermore, all of our products and solutions are manufactured with advanced equipment and strict QC procedures in order to ensure high quality. If you are interested in any of our items, make sure you don't hesitate to contact us. We will do our best to meet your needs.

Grade:

Seamless steel tubes for high / low and medium pressure boilers

10.20 etc.

GB3087

High qualuty carbon structural seamless ateel pipes for manufacturing of different kinds of low and medium pressure boilers.

SA106B, SA106C

ASME SA106

SA179/ SA192/ SA210A1, SA210C/

T11, T12, T22,
T23, T91, T92

ASME SA179/192/210/213

P11, P12, P22, P23, P36, P91, P92

ASME SA335

ST35.8, ST45.8, 15Mo3, 13CrMo44, 10CrMo910

DIN17175

P195GH, P235GH, P265GH, 16Mo3

EN10216-2

20G, 20MnG, 25MnG, 15CrMoG, 12Cr1MoVG, 12Cr2MoG

GB5310

Note:Other Size Can Also Be Provided After Consuliting With Customers

Standard:

ASTM

Standard2:

ASTM A335-2006

Grade:

A335 P1, A335 P11, A335 P12, A335 P5, A335 P9, A335 P91, A335 P92

Section Shape:

Round

Outer Diameter(Round):

6 - 914mm

Place of Origin:

Hengyang Valin Steel Tube Co.,Ltd

Hubei Xinyegang Steel Co., Ltd

Daye Special Steel Co., Ltd,

Yangzhou Chengde Steel Pipe Co., Ltd.

Baosteel

Application:

Boiler Pipe

Thickness:

1 - 80mm

Surface Treatment:

Oil

Certification:

ISO

CE

IBR

EN10204-2004 type3.2

BV/SGS/TUV inspection report

Technique:

Cold Drawn

hot rolled/rolling

Hot-expanded/expanding

Alloy Or Not:

Alloy

Special Pipe:

boiler tubes

Product name:

A335 P11 Alloy Steel Pipe for boiler

A335 P12 Alloy Steel Pipe for boiler

A335 P5 Alloy Steel Pipe for boiler

A335 P9 Alloy Steel Pipe for boiler

A335 P91 Alloy Steel Pipe for boiler

A335 P92 Alloy Steel Pipe for boiler

Keywords:

A335 P11 Alloy Steel Pipe

A335 P12 Alloy Steel Pipe

A335 P5 Alloy Steel Pipe

A335 P9 Alloy Steel Pipe

A335 P91 Alloy Steel Pipe

A335 P92 Alloy Steel Pipe

Brand Name:

SANON PIPE

BAOSTEEL

TPCO

DAYE PIPES

CHENGDE PIPE

VALIN PIPE

End protector:

Plain

Beveled

Type:

SMLS

Length:

5-12m

MTC:

En10204.3.2B

Heat treatment:

Yes

Secondary Or Not:

new

Non-secondary

Supply Ability

2000 Tons Per Month A335 P11 alloy steel pipe

2000 Tons Per Month A335 P12 alloy steel pipe

2000 Tons Per Month A335 P5 alloy steel pipe

2000 Tons Per Month A335 P9 alloy steel pipe

2000 Tons Per Month A335 P91 alloy steel pipe

2000 Tons Per Month A335 P92 alloy steel pipe

Packaging & Delivery

Packaging Details

A335 p22 Alloy Steel Pipe for boiler packaging:In bundles and in strong wooden box

Port

Shanghai

Tianjin

Lead Time

6-8 weeks

Payment:

LC

TT

D/P

AS DISCUSSED

QUALITY CONTROL

1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.

1
4
22


  • Previous:
  • Next:

  • Write your message here and send it to us