China High Pressure Boiler Seamless Alloy Steel Pipe ASME SA210 GRA

Short Description:

Standards:
ASME SA106—High temperature seamless carbon steel tube

ASME SA179—Seamless cold drawn low carbon steel pipe for heat exchanger and condenser

ASME SA192—Seamless carbon steel boiler tube for high pressure

ASME SA210—Seamless Medium Carbon Steel Pipe for Boilers and Superheaters

ASME SA213—Seamless ferritic and austenitic alloy steel pipes for boilers, superheaters and heat exchangers

ASME SA335—Seamless ferritic alloy steel nominal tube for high temperature

DIN17175 — Seamless steel pipe made of heat-resistant steel

EN10216-2 —Unalloyed steel and alloy steel pipes with specified high temperature properties

GB5310 —Seamless steel pipe for high pressure boiler

GB3087 —Seamless steel pipe for low and medium pressure boilers


Product Detail

Product Tags

With our leading technology as well as our spirit of innovation,mutual cooperation, benefits and development, we will build a prosperous future together with your esteemed company for Boiler Pipe, Seamless Steel Pipe, high pressure boiler pipe, We will not only continuously introduce technical guidance of experts from both home and abroad, but also develop the new and advanced products constantly to satisfactorily meet the needs of our clients all over the world.

Boiler pipe include this standard:

Grade:

Seamless steel tubes for high / low and medium pressure boilers

10.20 etc.

GB3087

High qualuty carbon structural seamless ateel pipes for manufacturing of different kinds of low and medium pressure boilers.

SA106B, SA106C

ASME SA106

SA179/ SA192/ SA210A1, SA210C/

T11, T12, T22,
T23, T91, T92

ASME SA179/192/210/213

P11, P12, P22, P23, P36, P91, P92

ASME SA335

ST35.8, ST45.8, 15Mo3, 13CrMo44, 10CrMo910

DIN17175

P195GH, P235GH, P265GH, 16Mo3

EN10216-2

20G, 20MnG, 25MnG, 15CrMoG, 12Cr1MoVG, 12Cr2MoG

GB5310

Note:Other Size Can Also Be Provided After Consuliting With Customers

We received one inquiry for SA210 GrA

OD THK Kg/M Material Length PCS Ton Standard
48.3 5.1 5.43 SA210 Gr.A1 11.8 302 19.35 ASME SA210

For this size , we done as cold drawn and Length is difficult need to talk with production department. our team work together for one day and discuss for this.

Finally give the best soluation for clients. Are you interested in ? If yes ,contact with me

 

GB5310-2008 Chemical Component

no

grade

Chemical Component %

Mechanical Property

 

 

C

Si

Mn

Cr

Mo

V

Ti

B

Ni

Alt

Cu

Nb

N

W

P

S

Tensile
MPa

Yield
MPa

Extend
L/T

Impect (J)
Vertical/ Horizontal

handness
HB

1

20G

0.17-
0.23

0.17-
0.37

0.35-
0.65


0.25


0.15


0.08


0.25


0.20


0.025


0.015

410-
550


245

24/22%

40/27

2

20MnG

0.17-
0.23

0.17-
0.37

0.70-
1.00


0.25


0.15


0.08


0.25


0.20


0.025


0.015

415-
560


240

22/20%

40/27

3

25MnG

0.22-
0.27

0.17-
0.37

0.70-
1.00


0.25


0.15


0.08


0.25


0.20


0.025


0.015

485-
640


275

20/18%

40/27

4

15MoG

0.12-
0.20

0.17-
0.37

0.40-
0.80


0.30

0.25-
0.35


0.08


0.30


0.20


0.025


0.015

450-
600


270

22/20%

40/27

6

12CrMoG

0.08-
0.15

0.17-
0.37

0.40-
0.70

0.40-
0.70

0.40-
0.65


0.08


0.30


0.20


0.025


0.015

410-
560


205

21/19%

40/27

7

15CrMoG

0.12-
0.18

0.17-
0.37

0.40-
0.70

0.80-
1.10

0.40-
0.55


0.08


0.30


0.20


0.025


0.015

440-
640


295

21/19%

40/27

8

12Cr2MoG

0.08-
0.15


0.50

0.40-
0.60

2.00-
2.50

0.90-
1.13


0.08


0.30


0.20


0.025


0.015

450-
600


280

22/20%

40/27

9

12Cr1MoVG

0.08-
0.15

0.17-
0.37

0.40-
0.70

0.90-
1.20

0.25-
0.35

0.15-
0.30


0.30


0.20


0.025


0.015

470-
640


255

21/19%

40/27

10

12Cr2MoWVTiB

0.08-
0.15

0.45-
0.75

0.45-
0.65

1.60-
2.10

0.50-
0.65

0.28-
0.42

0.08-
0.18

0.002-
0.008


0.30


0.20

0.30-
0.55


0.025


0.015

540-
735


345

18/-%

40/-

11

10Cr9Mo1VNbN

0.08-
0.12

0.20-
0.50

0.30-
0.60

8.00-
9.50

0.85-
1.05

0.18-
0.25


0.01


0.40


0.020


0.20

0.06-
0.10

0.030-
0.070


0.020


0.010


585


415

20/16%

40/27


250

12

10Cr9MoW2VNbBN

0.07-
0.13


0.50

0.30-
0.60

8.50-
9.50

0.30-
0.60

0.15-
0.25


0.01

0.0010-
0.0060


0.40


0.020


0.20

0.40-
0.09

0.030-
0.070

1.50-
2.00


0.020


0.010


620


440

20/16%

40/27


250

note:Alt is holo-al content 2 grade 08Cr18Ni11NbFG of “FG” is mean fine grain,a. no special request, can not add other chemical compinent b.grade 20G of Alt ≤ 0.015%, no working request, but should be showing on MTC

Standard:

ASTM

Standard2:

ASTM A213-2001, ASTM A213M-2001, ASTM A335-2006, ASTM A672-2006, ASTM

A789-2001, ASTM A789M-2001

Grade Group:

A53-A369

Grade:

A335 P1, A335 P11, A335 P12, A335 P5, A335 P9, A335 P91, A335 P92

Section Shape:

Round

Outer Diameter(Round):

6 - 914mm

Place of Origin:

Hengyang Valin Steel Tube Co.,Ltd

Hubei Xinyegang Steel Co., Ltd

Daye Special Steel Co., Ltd,

Yangzhou Chengde Steel Pipe Co., Ltd.

Baosteel

Application:

Boiler Pipe

Thickness:

1 - 80mm

Surface Treatment:

Oil

Certification:

ISO

CE

IBR

EN10204-2004 type3.2

BV/SGS/TUV inspection report

Technique:

Cold Drawn

hot rolled/rolling

Hot-expanded/expanding

Alloy Or Not:

Alloy

Special Pipe:

boiler tubes

Product name:

A335 P11 Alloy Steel Pipe for boiler

A335 P12 Alloy Steel Pipe for boiler

A335 P5 Alloy Steel Pipe for boiler

A335 P9 Alloy Steel Pipe for boiler

A335 P91 Alloy Steel Pipe for boiler

A335 P92 Alloy Steel Pipe for boiler

Keywords:

A335 P11 Alloy Steel Pipe

A335 P12 Alloy Steel Pipe

A335 P5 Alloy Steel Pipe

A335 P9 Alloy Steel Pipe

A335 P91 Alloy Steel Pipe

A335 P92 Alloy Steel Pipe

Brand Name:

SANON PIPE

BAOSTEEL

TPCO

DAYE PIPES

CHENGDE PIPE

VALIN PIPE

End protector:

Plain

Beveled

Type:

SMLS

Length:

5-12m

MTC:

En10204.3.2B

Heat treatment:

Yes

Secondary Or Not:

new

Non-secondary

Supply Ability

2000 Tons Per Month A335 P11 alloy steel pipe

2000 Tons Per Month A335 P12 alloy steel pipe

2000 Tons Per Month A335 P5 alloy steel pipe

2000 Tons Per Month A335 P9 alloy steel pipe

2000 Tons Per Month A335 P91 alloy steel pipe

2000 Tons Per Month A335 P92 alloy steel pipe

Packaging & Delivery

Packaging Details

A335 p22 Alloy Steel Pipe for boiler packaging:In bundles and in strong wooden box

Port

Shanghai

Tianjin

Lead Time

6-8 weeks

Payment:

LC

TT

D/P

AS DISCUSSED

QUALITY CONTROL

1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.

1
4
22


  • Previous:
  • Next:

  • Write your message here and send it to us