Europe style for China 3PP 3PE Coating Carbon Steel Pipe

Short Description:

GB T3087-2008

low pressure Medium pressure boiler pipe super heated steam pipe high quality seamless carbon steel pipe

Mainly for India market with IBR certification


  • Payment: 30% deposit, 70% L/C or B/L copy or 100% L/C at sight
  • Min.Order Quantity: 1 PC
  • Supply Ability: Annual 20000 Tons Inventory of Steel Pipe
  • Lead Time: 7-14 days if in stock, 30-45 days to produce
  • Packing: Black Vanishing, bevel and cap for every single pipe; OD below 219mm need to pack in bundle, and each bundle no exceed 2 tons.
  • Product Detail

    Product Tags

    China 3PP 3PE Coating for seamless Carbon Steel Pipe

    For different size 3 PE coating  thickness is different. Attached details for reference

    Steel Pipe Size DN epoxy coating
    um
    adhesive layer
    um
    Minimum thickness of coating
    Gerneral thickness Strength thickness
    DN≤100 ≥120 ≥170 1.8 2.5
    100<DN≤250 2 2.7
    250<DN<500 2.2 2.9
    500≤DN<800 ≥150 2.5 3.2
    800≤DN≤1200 3 3.7
    DN>1200 3.3 4.2

    Overview

    Application

    It is mainly used to make high-quality carbon structural steel, low pressure medium pressure boiler pipe, super heated steam carbon steel pipe

    Main Grade

    Grade of high-quality carbon structural steel: 10#,20#

     

    Chemical Component

    Standard Grade Chemical Composition(%)
    C Si Mn P S Cr Cu Ni
    GB3087 10 0.07~0.13 0.17~0.37 0.38~0.65 ≤0.030 ≤0.030 0.3~0.65 ≤0.25 ≤0.30
    20 0.17~0.23 0.17~0.37 0.38~0.65 ≤0.030 ≤0.030 0.3~0.65 ≤0.25 ≤0.30

    Mechanical Property

    Standard Steel pipe Wall thickness Tensile strength Yield Strength Elongation
    GB3087 (mm) (MPa) (MPa) %
    10 / 335~475 195 24
    20 <15 410~550 245 20
    ≥15 225

    Test Requirement

    In addition to ensuring chemical composition and mechanical properties, hydrostatic tests are performed one by one, and flaring and flattening tests are performed. .In addition , ET. UT are available

    Supply Ability

    Supply Ability: 2000 Tons Per Month Per Grade of GB/T3087-2008 Seamless Carbon Steel Pipe

    Packaging

    In Bundles And In Strong Wooden Box

    Delivery

    7-14 days if in stock, 30-45 days to produce

    Payment

    30% depsoit, 70% L/C or B/L copy   or  100% L/C at sight

    Product Detail

    High Pressure Boiler Tube


    GB/T5310-2017


    ASME SA-106/SA-106M-2015


    ASTMA210(A210M)-2012


    ASME SA-213/SA-213M


    ASTM A335/A335M-2018


  • Previous:
  • Next:

  • Write your message here and send it to us