Factory Cheap Hot P1 Alloy Pipe -  Seamlless steel tubes for high-pressure  chemical fertilizer processing equipments-GB6479-2013 – Sanonpipe

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We support our prospective buyers with ideal top quality merchandise and superior level provider. Becoming the specialist manufacturer in this sector, we have now attained abundant practical expertise in producing and managing for Alloy Low Pressure Boiler Pipe , Alloy Chemical Pipe Factory , Steel Pipe Kg , We are glad that we are steadily growing with the active and long term support of our satisfied customers!
Factory Cheap Hot P1 Alloy Pipe -  Seamlless steel tubes for high-pressure  chemical fertilizer processing equipments-GB6479-2013 – Sanonpipe Detail:

Overview

Application

Seamless steel pipe for high pressure fertilizer equipment is a high quality carbon structural steel and alloy steel seamless steel pipe suitable for chemical equipment and pipeline.

Main Grade

Grade of high-quality carbon structural steel: 10#、20#

Chemical Component

Chemical Component/%
NO C Si Mn Cr Mo V W Nb Ni P S
no more than
10 0. 07-0. 13 0. 17 -0. 37 0.35 -0. 65 - - - - - - 0.025 0.015
20 0. 17 -0. 23 0.17 -0. 37 0. 35-0.65 - - - - - - 0.025 0.015
Q345Ba 0. 12 -0. 20 0.20-0. 50 1.20-1.70 <0. 30 <0. 10 mis - <0.07 W0. 50 0.025 0.015
Q345C” 0. 12 -0. 20 0.20 -0. 50 1.20 -1. 70 W0. 30 <0. 10 <0. 15 - W0.07 <0. 50 0.025 0.015
Q345D” 0. 12 -0. 18 0.20 -0. 50 1. 20~1.70 W0. 30 <0. 10 <0. 15 - W0.07 <0. 50 0. 025 0.015
Q345Ea*b 0. 12 -0. 18 0. 20-0. 50 1. 20 -1.70 W0. 30 <0. 10 <0. 15 - <0.07 <0. 50 0. 025 0.01
12CrMo 0. 08-0. 15 0.17 -0. 37 0. 40-0. 70 0. 40-0. 70 0. 40-0. 55 - - - - 0. 025 0.015
15CrMo 0. 12 -0. 18 0. 17 -0. 37 0. 40-0. 70 0. 80-1. 10 0. 40-0.55 - - - - 0. 025 0. 015
12Cr2Mo 0. 08-0. 15 <0. 50 0. 40-0.6 2.00-2. 50 0. 90-1. 13 - - - - 0.025 0. 015
12Cr5Mo <0. 15 <0.50 <0. 60 4. 00-6.00 0. 40-0. 60 - - - <0. 60 0. 025 0. 015
lOMoWVNb 0. 07-0. 13 0. 50-0.8 0. 50-0.8 - 0. 60-0. 90 0. 30-0. 50 0. 50-0. 90 0. 06-0. 12 - 0.025 0.015
12SiMoVNb 0.08 -0. 14 0.50 -0.8 0. 60-0. 90 - 0. 90-1. 10 0. 30-0. 50 - 0. 04-0.08 - 0.025 0.015
awhen it is necessary to add fine grain elements, the steel shall contain at least one of Al, Nb, V and Ti. The added fine grain elements shall be indicated in the quality certificate. Ti content shall not be more than 0.20%
bAl content in steel shall not be less than 0.020%, or ala content in steel shall not be less than 0.015%

Mechanical Property

Grade Mechanical Property
Tensile
MPa
Yield
MPa
Elong after fracture A/% Reduction of area
Z/%
Shork absorption energy
(KV2)/J
Steel tube wall thickness/mm Test temperature/℃ portrait transver
W16 >16 — 40 >40 portrait transver
not less than not less than
10 335〜490 205 195 185 24 22
20 410〜550 245 235 225 24 22 0 40 27
Q345B 490〜670 345 335 325 21 19 20 40 27
Q345C 490〜670 345 335 325 21 19 0 40 27
Q345D 490〜670 345 335 325 21 19 -20 40 27
Q345E 490〜670 345 335 325 21 19 -40 40 27
12CrMo 410~560 205 195 185 21 19 20 40 27
15CrMo 440〜640 295 285 275 21 19 20 40 27
12Cr2Moa 450〜60。 280 20 18 20 40 27
12Cr5Mo 390〜590 195 185 175 22 20 20 40 27
lOMoWVNb 470〜670 295 285 275 19 17 20 40 27
12SiMoVNb 2470 315 305 295 19 17 50 20 40 27
a 12Cr2Mo pipe,When D<30 mm and SW3 mm,the lower yield strength or specified plastic extension strength can be reduced by 10 MPa.

Test Requirement

In addition to ensuring the chemical composition and mechanical properties, the steel pipe directly rolled by ingot shall be subject to low power inspection, and eddy current inspection or magnetic flux leakage inspection can be used instead of hydraulic test.

Supply Ability

2000 Tons Per Month Per Grade of  Seamless steel tubes for high-pressure

chemical fertilizer processing equipments.

Packaging

In Bundles And In Strong Wooden Box

Delivery

7-14 days if in stock, 30-45 days to produce

Payment

30% depsoit, 70% L/C or B/L copy   or  100% L/C at sight

Product Detail

 mechanical/Chemical&Fertilizer Pipes


eamless steel tubes for normal structure


 GB/T8162-2008


Seamless carbon steel and alloy mechanical tubes


 ASTM_A519-2006


Hot finished structural hollow sections of non-alloy and fine grain steels


 BS EN 10210-1-2006


Seamless, welded and hot-dip galvanized pipe


 ASTM A53A53M-2012


GB9948-2006-Seamless-Steel-Pipe-For-Petroleum-Cracking


 GB9948-2006


API-5L-oil-casing-and-tubing-oil (1)


GB6479-2013


High-quality-34Mn2v-35CrMo-carbon-Seamless-Steel


GB/T 17396-2009


Product detail pictures:

Factory Cheap Hot P1 Alloy Pipe -
  Seamlless steel tubes for high-pressure  chemical fertilizer processing equipments-GB6479-2013 – Sanonpipe detail pictures

Factory Cheap Hot P1 Alloy Pipe -
  Seamlless steel tubes for high-pressure  chemical fertilizer processing equipments-GB6479-2013 – Sanonpipe detail pictures

Factory Cheap Hot P1 Alloy Pipe -
  Seamlless steel tubes for high-pressure  chemical fertilizer processing equipments-GB6479-2013 – Sanonpipe detail pictures


Related Product Guide:

Our eternal pursuits are the attitude of "regard the market, regard the custom, regard the science" and the theory of "quality the basic, belief the very first and management the advanced" for Factory Cheap Hot P1 Alloy Pipe -  Seamlless steel tubes for high-pressure  chemical fertilizer processing equipments-GB6479-2013 – Sanonpipe , The product will supply to all over the world, such as: Florence , Austria , Cannes , By integrating manufacturing with foreign trade sectors, we can provide total customer solutions by guaranteeing the delivery of right products to the right place at the right time, which is supported by our abundant experiences, powerful production capability, consistent quality, diversified products and the control of the industry trend as well as our maturity before and after sales services. We'd like to share our ideas with you and welcome your comments and questions.
  • In our cooperated wholesalers, this company has the best quality and reasonable price, they are our first choice.
    5 Stars By Salome from Afghanistan - 2017.11.20 15:58
    Problems can be quickly and effectively resolved, it is worth to be trust and working together.
    5 Stars By Julie from Nigeria - 2018.05.13 17:00
    Write your message here and send it to us