Factory Supply Latest Design Hydraulic Pipe
We stick with the theory of “quality very first, support 1st, continual improvement and innovation to fulfill the customers” for that management and “zero defect, zero complaints” as the quality objective. To excellent our company, we provide the merchandise together with the great good quality at the reasonable cost for Factory Supply Latest Design Hydraulic Pipe 2sn 1/4 To 2 Inch Alloy Pipe, We’re keeping durable business associations with much more than 200 wholesalers during the USA, the UK, Germany and Canada. Should you be interested in almost any of our items, you should truly feel no cost to get in touch with us.
We stick with the theory of “quality very first, support 1st, continual improvement and innovation to fulfill the customers” for that management and “zero defect, zero complaints” as the quality objective. To excellent our company, we provide the merchandise together with the great good quality at the reasonable cost for High Pressure Pipe, Pressure Alloy Pipe, Our business activities and processes are engineered to make sure our customers have access to widest range of products and solutions with the shortest supply time lines. This achievement is made possible by our highly skilled and experienced team. We look for people who want to grow with us around the globe and stand out from the crowd. Now we have people who embrace tomorrow, have vision, love stretching their minds and going far beyond what they thought was achievable.
Overview
Application
Seamless steel pipe for high pressure fertilizer equipment is a high quality carbon structural steel and alloy steel seamless steel pipe suitable for chemical equipment and pipeline.
Main Grade
Grade of high-quality carbon structural steel: 10#、20#
Chemical Component
Chemical Component/% | ||||||||||||
NO | C | Si | Mn | Cr | Mo | V | W | Nb | Ni | P S | ||
no more than | ||||||||||||
10 | 0. 07-0. 13 | 0. 17 -0. 37 | 0.35 -0. 65 | - | - | - | - | - | - | 0.025 | 0.015 | |
20 | 0. 17 -0. 23 | 0.17 -0. 37 | 0. 35-0.65 | - | - | - | - | - | - | 0.025 | 0.015 | |
Q345Ba | 0. 12 -0. 20 | 0.20-0. 50 | 1.20-1.70 | <0. 30 | <0. 10 | mis | - | <0.07 | W0. 50 | 0.025 | 0.015 | |
Q345C” | 0. 12 -0. 20 | 0.20 -0. 50 | 1.20 -1. 70 | W0. 30 | <0. 10 | <0. 15 | - | W0.07 | <0. 50 | 0.025 | 0.015 | |
Q345D” | 0. 12 -0. 18 | 0.20 -0. 50 | 1. 20~1.70 | W0. 30 | <0. 10 | <0. 15 | - | W0.07 | <0. 50 | 0. 025 | 0.015 | |
Q345Ea*b | 0. 12 -0. 18 | 0. 20-0. 50 | 1. 20 -1.70 | W0. 30 | <0. 10 | <0. 15 | - | <0.07 | <0. 50 | 0. 025 | 0.01 | |
12CrMo | 0. 08-0. 15 | 0.17 -0. 37 | 0. 40-0. 70 | 0. 40-0. 70 | 0. 40-0. 55 | - | - | - | - | 0. 025 | 0.015 | |
15CrMo | 0. 12 -0. 18 | 0. 17 -0. 37 | 0. 40-0. 70 | 0. 80-1. 10 | 0. 40-0.55 | - | - | - | - | 0. 025 | 0. 015 | |
12Cr2Mo | 0. 08-0. 15 | <0. 50 | 0. 40-0.6 | 2.00-2. 50 | 0. 90-1. 13 | - | - | - | - | 0.025 | 0. 015 | |
12Cr5Mo | <0. 15 | <0.50 | <0. 60 | 4. 00-6.00 | 0. 40-0. 60 | - | - | - | <0. 60 | 0. 025 | 0. 015 | |
lOMoWVNb | 0. 07-0. 13 | 0. 50-0.8 | 0. 50-0.8 | - | 0. 60-0. 90 | 0. 30-0. 50 | 0. 50-0. 90 | 0. 06-0. 12 | - | 0.025 | 0.015 | |
12SiMoVNb | 0.08 -0. 14 | 0.50 -0.8 | 0. 60-0. 90 | - | 0. 90-1. 10 | 0. 30-0. 50 | - | 0. 04-0.08 | - | 0.025 | 0.015 | |
awhen it is necessary to add fine grain elements, the steel shall contain at least one of Al, Nb, V and Ti. The added fine grain elements shall be indicated in the quality certificate. Ti content shall not be more than 0.20% | ||||||||||||
bAl content in steel shall not be less than 0.020%, or ala content in steel shall not be less than 0.015% |
Mechanical Property
|
Test Requirement
In addition to ensuring the chemical composition and mechanical properties, the steel pipe directly rolled by ingot shall be subject to low power inspection, and eddy current inspection or magnetic flux leakage inspection can be used instead of hydraulic test.
Supply Ability
2000 Tons Per Month Per Grade of Seamless steel tubes for high-pressure
chemical fertilizer processing equipments.
Packaging
In Bundles And In Strong Wooden Box
Delivery
7-14 days if in stock, 30-45 days to produce
Payment
30% depsoit, 70% L/C or B/L copy or 100% L/C at sight