Factory wholesale China High Quality Carbon Steel Pipe

Short Description:

GB T3087-2008

low pressure Medium pressure boiler pipe super heated steam pipe high quality seamless carbon steel pipe

Mainly for India market with IBR certification


  • Payment: 30% deposit, 70% L/C or B/L copy or 100% L/C at sight
  • Min.Order Quantity: 1 PC
  • Supply Ability: Annual 20000 Tons Inventory of Steel Pipe
  • Lead Time: 7-14 days if in stock, 30-45 days to produce
  • Packing: Black Vanishing, bevel and cap for every single pipe; OD below 219mm need to pack in bundle, and each bundle no exceed 2 tons.
  • Product Detail

    Product Tags

    This week we have sent 20 containers seamless carbon steel pipe GB3087 20# to domestic project of Supermarket.

    you can find different pipe from different mills. Don't just see price because maybe you will have more troube

    after receiving goods.

    Overview

    Application

    It is mainly used to make high-quality carbon structural steel, low pressure medium pressure boiler pipe, super heated steam carbon steel pipe

    Main Grade

    Grade of high-quality carbon structural steel: 10#,20#

     

    Chemical Component

    Standard Grade Chemical Composition(%)
    C Si Mn P S Cr Cu Ni
    GB3087 10 0.07~0.13 0.17~0.37 0.38~0.65 ≤0.030 ≤0.030 0.3~0.65 ≤0.25 ≤0.30
    20 0.17~0.23 0.17~0.37 0.38~0.65 ≤0.030 ≤0.030 0.3~0.65 ≤0.25 ≤0.30

    Mechanical Property

    Standard Steel pipe Wall thickness Tensile strength Yield Strength Elongation
    GB3087 (mm) (MPa) (MPa) %
    10 / 335~475 195 24
    20 <15 410~550 245 20
    ≥15 225

    Test Requirement

    In addition to ensuring chemical composition and mechanical properties, hydrostatic tests are performed one by one, and flaring and flattening tests are performed. .In addition , ET. UT are available

    Supply Ability

    Supply Ability: 2000 Tons Per Month Per Grade of GB/T3087-2008 Seamless Carbon Steel Pipe

    Packaging

    In Bundles And In Strong Wooden Box

    Delivery

    7-14 days if in stock, 30-45 days to produce

    Payment

    30% depsoit, 70% L/C or B/L copy   or  100% L/C at sight

    Product Detail

    High Pressure Boiler Tube


    GB/T5310-2017


    ASME SA-106/SA-106M-2015


    ASTMA210(A210M)-2012


    ASME SA-213/SA-213M


    ASTM A335/A335M-2018


  • Previous:
  • Next:

  • Write your message here and send it to us