Good quality St52 Seamless Pipe - GB 3087 standard seamless boiler alloy steel pipe Low pressure Medium pressure – Sanonpipe
Good quality St52 Seamless Pipe - GB 3087 standard seamless boiler alloy steel pipe Low pressure Medium pressure – Sanonpipe Detail:
Overview
Application
It is mainly used to make high-quality carbon structural steel, low pressure medium pressure boiler pipe, super heated steam carbon steel pipe
Main Grade
Grade of high-quality carbon structural steel: 10#,20#
Chemical Component
Standard | Grade | Chemical Composition(%) | |||||||
C | Si | Mn | P | S | Cr | Cu | Ni | ||
GB3087 | 10 | 0.07~0.13 | 0.17~0.37 | 0.38~0.65 | ≤0.030 | ≤0.030 | 0.3~0.65 | ≤0.25 | ≤0.30 |
20 | 0.17~0.23 | 0.17~0.37 | 0.38~0.65 | ≤0.030 | ≤0.030 | 0.3~0.65 | ≤0.25 | ≤0.30 |
Mechanical Property
Standard | Steel pipe | Wall thickness | Tensile strength | Yield Strength | Elongation |
GB3087 | (mm) | (MPa) | (MPa) | % | |
≥ | |||||
10 | / | 335~475 | 195 | 24 | |
20 | <15 | 410~550 | 245 | 20 | |
≥15 | 225 |
Test Requirement
In addition to ensuring chemical composition and mechanical properties, hydrostatic tests are performed one by one, and flaring and flattening tests are performed. .In addition , ET. UT are available
Supply Ability
Supply Ability: 2000 Tons Per Month Per Grade of GB/T3087-2008 Seamless Carbon Steel Pipe
Packaging
In Bundles And In Strong Wooden Box
Delivery
7-14 days if in stock, 30-45 days to produce
Payment
30% depsoit, 70% L/C or B/L copy or 100% L/C at sight
Product Detail
High Pressure Boiler Tube
GB/T5310-2017
ASME SA-106/SA-106M-2015
ASTMA210(A210M)-2012
ASME SA-213/SA-213M
ASTM A335/A335M-2018
Product detail pictures:
Related Product Guide:
As a way to finest meet up with client's wants, all of our operations are strictly performed in line with our motto "High Quality, Aggressive Price, Fast Service" for Good quality St52 Seamless Pipe - GB 3087 standard seamless boiler alloy steel pipe Low pressure Medium pressure – Sanonpipe , The product will supply to all over the world, such as: Cyprus , London , Belgium , In order to meet more market demands and long-term development, a 150, 000-square-meter new factory is under construction, which will be put into use in 2014. Then, we shall own a large capacity of producing. Of course, we are going to continue improving the service system to meet the requirements of customers, bringing health, happiness and beauty to everyone.
By Alberta from London - 2017.11.20 15:58
The customer service staff's attitude is very sincere and the reply is timely and very detailed, this is very helpful for our deal,thank you.
By Murray from Singapore - 2018.07.26 16:51
Write your message here and send it to us