High reputation Alloy Pipe Manufacturer -  Seamless steel tubes for coal mining- GB/T 17396-2009 – Sanonpipe

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We rely upon strategic thinking, constant modernisation in all segments, technological advances and of course upon our employees that directly participate inside our success for Hollow Section Steel , Steel Pipe Gas , Alloy Steel Pipe 12cr1mov , We'll do our greatest to fulfill your specifications and are sincerely searching ahead to developing mutual helpful small business marriage with you!
High reputation Alloy Pipe Manufacturer -  Seamless steel tubes for coal mining- GB/T 17396-2009 – Sanonpipe Detail:

Overview

Application

Seamless steel pipe for coal mine is mainly used to manufacture seamless pipe for hydraulic prop in coal mine.

Main Grade

Grade of high-quality carbon structural steel: 20#、35#

Chemical Component

Grade Chemical Component/%
C Si Mn Nb RE Cr Ni Cu Mo p S
20 0. 17 一0. 23 0.17 一0. 37 0. 35一0.65 <0. 25 <0. 25 <0. 20 <0. 035 <0. 035
35 0. 32一0. 39 0.17—0. 37 0. 50一0.8 <0. 25 <0.25 <0. 20 <0. 035 <0. 035
45 0. 42一0. 50 0.17 一0. 37 0.50 一0.8 <0. 25 WO. 25 WO. 20 <0.035 <0.035
27SiMn 0. 24一0. 32 1.10 一1.4 1.10 一1.4 W0. 30 <0.30 <0. 20 <0.15 <0.035 <0. 035
30MnNbREa 0.27 一0. 36 0. 20一0. 60 1.20 一1. 60 0.020一0. 050 0. 02一0. 04 <0. 30 <0. 30 <0. 20 <0.15 <0. 035 <0. 035
a The content of re is calculated as 0.02% ~ 0.04% added to the molten steel.

Mechanical Property

Mechanical Property
Grade Tensile strength
Rm/MPa
Yield
MPa
Elong after fracture
A/%
Reduction of area
Z/%
Shork absorption energy (KV2)/J
Steel tube wall thickness/mm
<16 >16 〜30 >30
no more less
20 410 245 235 225 20
35 510 305 295 285 17
45 590 335 325 315 14
27SiMn 980 835 12 40 39
30MnNbRE 850 720 13 45 48

Test Requirement

In addition to ensuring the chemical composition and mechanical properties, the steel pipe directly rolled with ingot shall be subject to low power inspection.

Supply Ability

Supply Ability: 2000 Tons Per Month Per Grade of   Seamless steel tubes for coal mining.

Packaging

In Bundles And In Strong Wooden Box

Delivery

7-14 days if in stock, 30-45 days to produce

Payment

30% depsoit, 70% L/C or B/L copy   or  100% L/C at sight

Product Detail

mechanical/Chemical&Fertilizer Pipes


eamless steel tubes for normal structure


 GB/T8162-2008


Seamless carbon steel and alloy mechanical tubes


ASTM_A519-2006


Hot finished structural hollow sections of non-alloy and fine grain steels


 BS EN 10210-1-2006


Seamless, welded and hot-dip galvanized pipe


 ASTM A53A53M-2012 


GB9948-2006-Seamless-Steel-Pipe-For-Petroleum-Cracking


GB9948-2006


API-5L-oil-casing-and-tubing-oil (1)


 GB6479-2013


High-quality-34Mn2v-35CrMo-carbon-Seamless-Steel


 GB/T 17396-2009


Product detail pictures:

High reputation Alloy Pipe Manufacturer -
  Seamless steel tubes for coal mining- GB/T 17396-2009 – Sanonpipe detail pictures

High reputation Alloy Pipe Manufacturer -
  Seamless steel tubes for coal mining- GB/T 17396-2009 – Sanonpipe detail pictures

High reputation Alloy Pipe Manufacturer -
  Seamless steel tubes for coal mining- GB/T 17396-2009 – Sanonpipe detail pictures


Related Product Guide:

We persistently execute our spirit of ''Innovation bringing growth, Highly-quality making sure subsistence, Administration marketing reward, Credit history attracting clients for High reputation Alloy Pipe Manufacturer -  Seamless steel tubes for coal mining- GB/T 17396-2009 – Sanonpipe , The product will supply to all over the world, such as: Surabaya , Malta , Sacramento , We always stick to the tenet of "sincerity, high quality, high efficiency, innovation". With years of efforts, we have established friendly and stable business relationships with worldwide customers. We welcome any of your inquiries and concerns for our products, and we are sure that we will offer just what you want, as we always believe that your satisfaction is our success.
  • This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
    5 Stars By Johnny from Cancun - 2018.09.16 11:31
    The goods are very perfect and the company sales manager is warmful, we will come to this company to purchase next time.
    5 Stars By Deborah from Israel - 2017.11.20 15:58
    Write your message here and send it to us