OEM China Seamless Steel Pipe A335 P11 -  Seamless steel tubes for coal mining- GB/T 17396-2009 – Sanonpipe

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

That has a sound business credit history, outstanding after-sales service and modern producing facilities, we have earned an superb popularity amid our buyers across the planet for En10216-2 , Steel Pipe Od Sizes , Baosteel Pipe , Now we have extensive goods source as well as price tag is our advantage. Welcome to inquire about our products and solutions.
OEM China Seamless Steel Pipe A335 P11 -  Seamless steel tubes for coal mining- GB/T 17396-2009 – Sanonpipe Detail:

Overview

Application

Seamless steel pipe for coal mine is mainly used to manufacture seamless pipe for hydraulic prop in coal mine.

Main Grade

Grade of high-quality carbon structural steel: 20#、35#

Chemical Component

Grade Chemical Component/%
C Si Mn Nb RE Cr Ni Cu Mo p S
20 0. 17 一0. 23 0.17 一0. 37 0. 35一0.65 <0. 25 <0. 25 <0. 20 <0. 035 <0. 035
35 0. 32一0. 39 0.17—0. 37 0. 50一0.8 <0. 25 <0.25 <0. 20 <0. 035 <0. 035
45 0. 42一0. 50 0.17 一0. 37 0.50 一0.8 <0. 25 WO. 25 WO. 20 <0.035 <0.035
27SiMn 0. 24一0. 32 1.10 一1.4 1.10 一1.4 W0. 30 <0.30 <0. 20 <0.15 <0.035 <0. 035
30MnNbREa 0.27 一0. 36 0. 20一0. 60 1.20 一1. 60 0.020一0. 050 0. 02一0. 04 <0. 30 <0. 30 <0. 20 <0.15 <0. 035 <0. 035
a The content of re is calculated as 0.02% ~ 0.04% added to the molten steel.

Mechanical Property

Mechanical Property
Grade Tensile strength
Rm/MPa
Yield
MPa
Elong after fracture
A/%
Reduction of area
Z/%
Shork absorption energy (KV2)/J
Steel tube wall thickness/mm
<16 >16 〜30 >30
no more less
20 410 245 235 225 20
35 510 305 295 285 17
45 590 335 325 315 14
27SiMn 980 835 12 40 39
30MnNbRE 850 720 13 45 48

Test Requirement

In addition to ensuring the chemical composition and mechanical properties, the steel pipe directly rolled with ingot shall be subject to low power inspection.

Supply Ability

Supply Ability: 2000 Tons Per Month Per Grade of   Seamless steel tubes for coal mining.

Packaging

In Bundles And In Strong Wooden Box

Delivery

7-14 days if in stock, 30-45 days to produce

Payment

30% depsoit, 70% L/C or B/L copy   or  100% L/C at sight

Product Detail

mechanical/Chemical&Fertilizer Pipes


eamless steel tubes for normal structure


 GB/T8162-2008


Seamless carbon steel and alloy mechanical tubes


ASTM_A519-2006


Hot finished structural hollow sections of non-alloy and fine grain steels


 BS EN 10210-1-2006


Seamless, welded and hot-dip galvanized pipe


 ASTM A53A53M-2012 


GB9948-2006-Seamless-Steel-Pipe-For-Petroleum-Cracking


GB9948-2006


API-5L-oil-casing-and-tubing-oil (1)


 GB6479-2013


High-quality-34Mn2v-35CrMo-carbon-Seamless-Steel


 GB/T 17396-2009


Product detail pictures:

OEM China Seamless Steel Pipe A335 P11 -
  Seamless steel tubes for coal mining- GB/T 17396-2009 – Sanonpipe detail pictures

OEM China Seamless Steel Pipe A335 P11 -
  Seamless steel tubes for coal mining- GB/T 17396-2009 – Sanonpipe detail pictures

OEM China Seamless Steel Pipe A335 P11 -
  Seamless steel tubes for coal mining- GB/T 17396-2009 – Sanonpipe detail pictures


Related Product Guide:

Attaining consumer satisfaction is our company's purpose without end. We will make wonderful endeavours to produce new and top-quality merchandise, satisfy your exclusive requirements and supply you with pre-sale, on-sale and after-sale services for OEM China Seamless Steel Pipe A335 P11 -  Seamless steel tubes for coal mining- GB/T 17396-2009 – Sanonpipe , The product will supply to all over the world, such as: Madrid , Luxembourg , Ottawa , Welcome to visit our company, factory and our showroom where displays various hair products that will meet your expectation. Meanwhile, it is convenient to visit our website, and our sales staff will try their best to provide you the best service. Please contact us if you need more information. Our aim is to help customers realize their goals. We are making great efforts to achieve this win-win situation.
  • The product manager is a very hot and professional person, we have a pleasant conversation, and finally we reached a consensus agreement.
    5 Stars By Andy from Mexico - 2017.08.18 11:04
    The factory technical staff gave us a lot of good advice in the cooperation process, this is very good, we are very grateful.
    5 Stars By Eleanore from Sri Lanka - 2018.06.05 13:10
    Write your message here and send it to us