Online Exporter China A335 P91 Alloy Seamless Pipe for Boiler Pipe
Our company aims to operating faithfully, serving to all of our customers , and working in new technology and new machine constantly for Alloy Boiler Pipe, Boiler Pipe, seamless boiler pipe, Steel Pipe, Customer's satisfaction is always our quest, creating value for customers is always our duty, a long term mutual-beneficial business relationship is what we're doing for. We've been an absolutely reliable partner in your case in China. Of course, other services, like consulting, can be offered too.
A335 P91
Grade | UN | C≤ | Mn | P≤ | S≤ | Si≤ | Cr | Mo |
Sequiv. | ||||||||
P1 | K11522 | 0.10~0.20 | 0.30~0.80 | 0.025 | 0.025 | 0.10~0.50 | – | 0.44~0.65 |
P2 | K11547 | 0.10~0.20 | 0.30~0.61 | 0.025 | 0.025 | 0.10~0.30 | 0.50~0.81 | 0.44~0.65 |
P5 | K41545 | 0.15 | 0.30~0.60 | 0.025 | 0.025 | 0.5 | 4.00~6.00 | 0.44~0.65 |
P5b | K51545 | 0.15 | 0.30~0.60 | 0.025 | 0.025 | 1.00~2.00 | 4.00~6.00 | 0.44~0.65 |
P5c | K41245 | 0.12 | 0.30~0.60 | 0.025 | 0.025 | 0.5 | 4.00~6.00 | 0.44~0.65 |
P9 | S50400 | 0.15 | 0.30~0.60 | 0.025 | 0.025 | 0.50~1.00 | 8.00~10.00 | 0.44~0.65 |
P11 | K11597 | 0.05~0.15 | 0.30~0.61 | 0.025 | 0.025 | 0.50~1.00 | 1.00~1.50 | 0.44~0.65 |
P12 | K11562 | 0.05~0.15 | 0.30~0.60 | 0.025 | 0.025 | 0.5 | 0.80~1.25 | 0.44~0.65 |
P15 | K11578 | 0.05~0.15 | 0.30~0.60 | 0.025 | 0.025 | 1.15~1.65 | – | 0.44~0.65 |
P21 | K31545 | 0.05~0.15 | 0.30~0.60 | 0.025 | 0.025 | 0.5 | 2.65~3.35 | 0.80~1.60 |
P22 | K21590 | 0.05~0.15 | 0.30~0.60 | 0.025 | 0.025 | 0.5 | 1.90~2.60 | 0.87~1.13 |
P91 | K91560 | 0.08~0.12 | 0.30~0.60 | 0.02 | 0.01 | 0.20~0.50 | 8.00~9.50 | 0.85~1.05 |
P92 | K92460 | 0.07~0.13 | 0.30~0.60 | 0.02 | 0.01 | 0.5 | 8.50~9.50 | 0.30~0.60 |
Mechanical Property
Mechanical Properties | P1,P2 | P12 | P23 | P91 | P92,P11 | P122 |
Tensile Strength | 380 | 415 | 510 | 585 | 620 | 620 |
Yield Strength | 205 | 220 | 400 | 415 | 440 | 400 |
Grade:
Seamless steel tubes for high / low and medium pressure boilers |
10.20 etc. |
GB3087 |
High qualuty carbon structural seamless ateel pipes for manufacturing of different kinds of low and medium pressure boilers. |
SA106B, SA106C |
ASME SA106 |
||
SA179/ SA192/ SA210A1, SA210C/ T11, T12, T22, |
ASME SA179/192/210/213 |
||
P11, P12, P22, P23, P36, P91, P92 |
ASME SA335 |
||
ST35.8, ST45.8, 15Mo3, 13CrMo44, 10CrMo910 |
DIN17175 |
||
P195GH, P235GH, P265GH, 16Mo3 |
EN10216-2 |
||
20G, 20MnG, 25MnG, 15CrMoG, 12Cr1MoVG, 12Cr2MoG |
GB5310 |
Note:Other Size Can Also Be Provided After Consuliting With Customers
GB5310-2008 Chemical Component |
||||||||||||||||||||||
no |
grade |
Chemical Component % |
Mechanical Property |
|||||||||||||||||||
|
|
C |
Si |
Mn |
Cr |
Mo |
V |
Ti |
B |
Ni |
Alt |
Cu |
Nb |
N |
W |
P |
S |
Tensile |
Yield |
Extend |
Impect (J) |
handness |
1 |
20G |
0.17- |
0.17- |
0.35- |
≤ |
≤ |
≤ |
— |
— |
≤ |
— |
≤ |
— |
— |
— |
≤ |
≤ |
410- |
≥ |
24/22% |
40/27 |
— |
2 |
20MnG |
0.17- |
0.17- |
0.70- |
≤ |
≤ |
≤ |
— |
— |
≤ |
— |
≤ |
— |
— |
— |
≤ |
≤ |
415- |
≥ |
22/20% |
40/27 |
— |
3 |
25MnG |
0.22- |
0.17- |
0.70- |
≤ |
≤ |
≤ |
— |
— |
≤ |
— |
≤ |
— |
— |
— |
≤ |
≤ |
485- |
≥ |
20/18% |
40/27 |
— |
4 |
15MoG |
0.12- |
0.17- |
0.40- |
≤ |
0.25- |
≤ |
— |
— |
≤ |
— |
≤ |
— |
— |
— |
≤ |
≤ |
450- |
≥ |
22/20% |
40/27 |
— |
6 |
12CrMoG |
0.08- |
0.17- |
0.40- |
0.40- |
0.40- |
≤ |
— |
— |
≤ |
— |
≤ |
— |
— |
— |
≤ |
≤ |
410- |
≥ |
21/19% |
40/27 |
— |
7 |
15CrMoG |
0.12- |
0.17- |
0.40- |
0.80- |
0.40- |
≤ |
— |
— |
≤ |
— |
≤ |
— |
— |
— |
≤ |
≤ |
440- |
≥ |
21/19% |
40/27 |
— |
8 |
12Cr2MoG |
0.08- |
≤ |
0.40- |
2.00- |
0.90- |
≤ |
— |
— |
≤ |
— |
≤ |
— |
— |
— |
≤ |
≤ |
450- |
≥ |
22/20% |
40/27 |
— |
9 |
12Cr1MoVG |
0.08- |
0.17- |
0.40- |
0.90- |
0.25- |
0.15- |
— |
— |
≤ |
— |
≤ |
— |
— |
— |
≤ |
≤ |
470- |
≥ |
21/19% |
40/27 |
— |
10 |
12Cr2MoWVTiB |
0.08- |
0.45- |
0.45- |
1.60- |
0.50- |
0.28- |
0.08- |
0.002- |
≤ |
— |
≤ |
— |
— |
0.30- |
≤ |
≤ |
540- |
≥ |
18/-% |
40/- |
— |
11 |
10Cr9Mo1VNbN |
0.08- |
0.20- |
0.30- |
8.00- |
0.85- |
0.18- |
≤ |
— |
≤ |
≤ |
≤ |
0.06- |
0.030- |
— |
≤ |
≤ |
≥ |
≥ |
20/16% |
40/27 |
≤ |
12 |
10Cr9MoW2VNbBN |
0.07- |
≤ |
0.30- |
8.50- |
0.30- |
0.15- |
≤ |
0.0010- |
≤ |
≤ |
≤ |
0.40- |
0.030- |
1.50- |
≤ |
≤ |
≥ |
≥ |
20/16% |
40/27 |
≤ |
note:Alt is holo-al content 2 grade 08Cr18Ni11NbFG of “FG” is mean fine grain,a. no special request, can not add other chemical compinent b.grade 20G of Alt ≤ 0.015%, no working request, but should be showing on MTC
Standard:
ASTM
Standard2:
ASTM A213-2001, ASTM A213M-2001, ASTM A335-2006, ASTM A672-2006, ASTM
A789-2001, ASTM A789M-2001
Grade Group:
A53-A369
Grade:
A335 P1, A335 P11, A335 P12, A335 P5, A335 P9, A335 P91, A335 P92
Section Shape:
Round
Outer Diameter(Round):
6 - 914mm
Place of Origin:
Hengyang Valin Steel Tube Co.,Ltd
Hubei Xinyegang Steel Co., Ltd
Daye Special Steel Co., Ltd,
Yangzhou Chengde Steel Pipe Co., Ltd.
Baosteel
Application:
Boiler Pipe
Thickness:
1 - 80mm
Surface Treatment:
Oil
Certification:
ISO
CE
IBR
EN10204-2004 type3.2
BV/SGS/TUV inspection report
Technique:
Cold Drawn
hot rolled/rolling
Hot-expanded/expanding
Alloy Or Not:
Alloy
Special Pipe:
boiler tubes
Product name:
A335 P11 Alloy Steel Pipe for boiler
A335 P12 Alloy Steel Pipe for boiler
A335 P5 Alloy Steel Pipe for boiler
A335 P9 Alloy Steel Pipe for boiler
A335 P91 Alloy Steel Pipe for boiler
A335 P92 Alloy Steel Pipe for boiler
Keywords:
A335 P11 Alloy Steel Pipe
A335 P12 Alloy Steel Pipe
A335 P5 Alloy Steel Pipe
A335 P9 Alloy Steel Pipe
A335 P91 Alloy Steel Pipe
A335 P92 Alloy Steel Pipe
Brand Name:
SANON PIPE
BAOSTEEL
TPCO
DAYE PIPES
CHENGDE PIPE
VALIN PIPE
End protector:
Plain
Beveled
Type:
SMLS
Length:
5-12m
MTC:
En10204.3.2B
Heat treatment:
Yes
Secondary Or Not:
new
Non-secondary
Supply Ability
2000 Tons Per Month A335 P11 alloy steel pipe
2000 Tons Per Month A335 P12 alloy steel pipe
2000 Tons Per Month A335 P5 alloy steel pipe
2000 Tons Per Month A335 P9 alloy steel pipe
2000 Tons Per Month A335 P91 alloy steel pipe
2000 Tons Per Month A335 P92 alloy steel pipe
Packaging & Delivery
Packaging Details
A335 p22 Alloy Steel Pipe for boiler packaging:In bundles and in strong wooden box
Port
Shanghai
Tianjin
Lead Time
6-8 weeks
Payment:
LC
TT
D/P
AS DISCUSSED
QUALITY CONTROL
1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.