Inspection and testing HP, WP Boiler Pipe
Our company specializes in exporting seamless steel tubes, alloy steel tubes, boiler tubes.When it comes to steel tube products, we will inevitably encounter some professional terms.
The Hold point and Witness point are always found and indicated in the Inspection and Test Plan. They are the construction stages which may need supplementary inspection or verification. See how to use Hold Points and Witness points when inspections or verifications are required. What is it? There are two important inspection actions that must be carried out in respect of the Inspection and Test Plan, they are called Hold Points and Witness points. They are points in the construction stage where inspection or verification is required. Their purpose is to make sure specification requirements have complied accordingly and to proceed for the activities.Why would you want it? The definition of a Hold Point versus a Witness Point: A Hold Point is a mandatory verification point beyond which work cannot proceed without approval by the designated authority, typically the Engineer or Consultant or 3rd Party Inspector. Work cannot proceed until receipt of a Hold Point Release issued by the person(s) whom inspected the work. A Witness Point is an identified point in the process where the designated authority, typically the Engineer or Consultant or 3rd Party Inspector may review, witness, inspect method or process of work. The activities, however, may proceed.
Our company has rich experience not only in products and exports, but also in details, such as Boiler Pipes, Boiler pipes HP, Boiler pipes inspection, Boiler pipes RD, Boiler pipes RI, Boiler pipes SP, Boiler pipes testing, Boiler pipes WP, If you are interested in any of our merchandise or would like to discuss a custom order, remember to feel free to contact us. We’re looking forward to forming successful business relationships with new clients around the world in the near future.
Grade:
Seamless steel tubes for high / low and medium pressure boilers |
10.20 etc. |
GB3087 |
High qualuty carbon structural seamless ateel pipes for manufacturing of different kinds of low and medium pressure boilers. |
SA106B, SA106C |
ASME SA106 |
||
SA179/ SA192/ SA210A1, SA210C/ T11, T12, T22, |
ASME SA179/192/210/213 |
||
P11, P12, P22, P23, P36, P91, P92 |
ASME SA335 |
||
ST35.8, ST45.8, 15Mo3, 13CrMo44, 10CrMo910 |
DIN17175 |
||
P195GH, P235GH, P265GH, 16Mo3 |
EN10216-2 |
||
20G, 20MnG, 25MnG, 15CrMoG, 12Cr1MoVG, 12Cr2MoG |
GB5310 |
Note:Other Size Can Also Be Provided After Consuliting With Customers
GB5310-2008 Chemical Component |
||||||||||||||||||||||
no |
grade |
Chemical Component % |
Mechanical Property |
|||||||||||||||||||
|
|
C |
Si |
Mn |
Cr |
Mo |
V |
Ti |
B |
Ni |
Alt |
Cu |
Nb |
N |
W |
P |
S |
Tensile |
Yield |
Extend |
Impect (J) |
handness |
1 |
20G |
0.17- |
0.17- |
0.35- |
≤ |
≤ |
≤ |
— |
— |
≤ |
— |
≤ |
— |
— |
— |
≤ |
≤ |
410- |
≥ |
24/22% |
40/27 |
— |
2 |
20MnG |
0.17- |
0.17- |
0.70- |
≤ |
≤ |
≤ |
— |
— |
≤ |
— |
≤ |
— |
— |
— |
≤ |
≤ |
415- |
≥ |
22/20% |
40/27 |
— |
3 |
25MnG |
0.22- |
0.17- |
0.70- |
≤ |
≤ |
≤ |
— |
— |
≤ |
— |
≤ |
— |
— |
— |
≤ |
≤ |
485- |
≥ |
20/18% |
40/27 |
— |
4 |
15MoG |
0.12- |
0.17- |
0.40- |
≤ |
0.25- |
≤ |
— |
— |
≤ |
— |
≤ |
— |
— |
— |
≤ |
≤ |
450- |
≥ |
22/20% |
40/27 |
— |
6 |
12CrMoG |
0.08- |
0.17- |
0.40- |
0.40- |
0.40- |
≤ |
— |
— |
≤ |
— |
≤ |
— |
— |
— |
≤ |
≤ |
410- |
≥ |
21/19% |
40/27 |
— |
7 |
15CrMoG |
0.12- |
0.17- |
0.40- |
0.80- |
0.40- |
≤ |
— |
— |
≤ |
— |
≤ |
— |
— |
— |
≤ |
≤ |
440- |
≥ |
21/19% |
40/27 |
— |
8 |
12Cr2MoG |
0.08- |
≤ |
0.40- |
2.00- |
0.90- |
≤ |
— |
— |
≤ |
— |
≤ |
— |
— |
— |
≤ |
≤ |
450- |
≥ |
22/20% |
40/27 |
— |
9 |
12Cr1MoVG |
0.08- |
0.17- |
0.40- |
0.90- |
0.25- |
0.15- |
— |
— |
≤ |
— |
≤ |
— |
— |
— |
≤ |
≤ |
470- |
≥ |
21/19% |
40/27 |
— |
10 |
12Cr2MoWVTiB |
0.08- |
0.45- |
0.45- |
1.60- |
0.50- |
0.28- |
0.08- |
0.002- |
≤ |
— |
≤ |
— |
— |
0.30- |
≤ |
≤ |
540- |
≥ |
18/-% |
40/- |
— |
11 |
10Cr9Mo1VNbN |
0.08- |
0.20- |
0.30- |
8.00- |
0.85- |
0.18- |
≤ |
— |
≤ |
≤ |
≤ |
0.06- |
0.030- |
— |
≤ |
≤ |
≥ |
≥ |
20/16% |
40/27 |
≤ |
12 |
10Cr9MoW2VNbBN |
0.07- |
≤ |
0.30- |
8.50- |
0.30- |
0.15- |
≤ |
0.0010- |
≤ |
≤ |
≤ |
0.40- |
0.030- |
1.50- |
≤ |
≤ |
≥ |
≥ |
20/16% |
40/27 |
≤ |
note:Alt is holo-al content 2 grade 08Cr18Ni11NbFG of “FG” is mean fine grain,a. no special request, can not add other chemical compinent b.grade 20G of Alt ≤ 0.015%, no working request, but should be showing on MTC
Standard:
ASTM
Standard2:
ASTM A213-2001, ASTM A213M-2001, ASTM A335-2006, ASTM A672-2006, ASTM
A789-2001, ASTM A789M-2001
Grade Group:
A53-A369
Grade:
A335 P1, A335 P11, A335 P12, A335 P5, A335 P9, A335 P91, A335 P92
Section Shape:
Round
Outer Diameter(Round):
6 – 914mm
Place of Origin:
Hengyang Valin Steel Tube Co.,Ltd
Hubei Xinyegang Steel Co., Ltd
Daye Special Steel Co., Ltd,
Yangzhou Chengde Steel Pipe Co., Ltd.
Baosteel
Application:
Boiler Pipe
Thickness:
1 – 80mm
Surface Treatment:
Oil
Certification:
ISO
CE
IBR
EN10204-2004 type3.2
BV/SGS/TUV inspection report
Technique:
Cold Drawn
hot rolled/rolling
Hot-expanded/expanding
Alloy Or Not:
Alloy
Special Pipe:
boiler tubes
Product name:
A335 P11 Alloy Steel Pipe for boiler
A335 P12 Alloy Steel Pipe for boiler
A335 P5 Alloy Steel Pipe for boiler
A335 P9 Alloy Steel Pipe for boiler
A335 P91 Alloy Steel Pipe for boiler
A335 P92 Alloy Steel Pipe for boiler
Keywords:
A335 P11 Alloy Steel Pipe
A335 P12 Alloy Steel Pipe
A335 P5 Alloy Steel Pipe
A335 P9 Alloy Steel Pipe
A335 P91 Alloy Steel Pipe
A335 P92 Alloy Steel Pipe
Brand Name:
SANON PIPE
BAOSTEEL
TPCO
DAYE PIPES
CHENGDE PIPE
VALIN PIPE
End protector:
Plain
Beveled
Type:
SMLS
Length:
5-12m
MTC:
En10204.3.2B
Heat treatment:
Yes
Secondary Or Not:
new
Non-secondary
Supply Ability
2000 Tons Per Month A335 P11 alloy steel pipe
2000 Tons Per Month A335 P12 alloy steel pipe
2000 Tons Per Month A335 P5 alloy steel pipe
2000 Tons Per Month A335 P9 alloy steel pipe
2000 Tons Per Month A335 P91 alloy steel pipe
2000 Tons Per Month A335 P92 alloy steel pipe
Packaging & Delivery
Packaging Details
A335 p22 Alloy Steel Pipe for boiler packaging:In bundles and in strong wooden box
Port
Shanghai
Tianjin
Lead Time
6-8 weeks
Payment:
LC
TT
D/P
AS DISCUSSED
QUALITY CONTROL
1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.